weberfloor 4670N Marine Base - Weber

This website uses cookies to ensure that we give you the best experience on our website.
By continuing to browse the site you are agreeing to our use of cookies. If you want to read our cookie policy or here for our privacy policy

Weber Saint-Gobain - Official website of the company

weberfloor 4670N Marine Base

weberfloor 4670N Marine Base
weberfloor 4670N Marine Base

Product benefits

  • For most types of subtrates
  • For slope building and thicker layers
  • Rapid drying and fast setting
  • High surface strength

Rapid drying mortar for screeding and slope building inside in living quarters, wet areas and other high traffic areas (mainly foot traffic) for marine and offshore installations.

Description

Product description

weber.floor 4670 Marine Base is a rapid drying mortar for use on steel-, galvanised steel- and aluminium decks as well as existing concrete and stone and ceramics. It has a somewhat coarser structure than self-levelling compounds, and needs to be primed and fine smoothed prior to laying floor coverings. weber.floor 4670 is supplied as pre-mixed dry powder, water is added on site of construction. The material is mixed and applied by hand, quickly attains a high surface strength and is walkable after 1-3 hours. Final covering after 1 day. Note that the curing time depends on the substrate temperature and the ambient air temperature of the work area as well as the relative humidity. weber.floor 4670 meets all fire technical requirements as a subfloor for floor coverings in passenger/merchant vessels and offshore installations according to IMO Res. A.687 (17). For special applications not covered in this product datasheet, please contact Weber for further advice and guidance. Also refer to applicable national regulations.

Substrate

Steel, galvanised steel, aluminium, concrete/cement-based, stone and ceramics and plywood boards. The substrate shall be clean and free from dust, cement rich skin and laitance, grease and oil residues, weak surface layers and other impurities that might prevent adhesion. Laitence of old coatings and contaminants should be removed mechanically, e.g. by shot blasting or flame cleaning. The surface tensile strength of the substrate should be above 1.0 N/mm2 (MPa). The substrate temperature should be above +10°C.

Documentation

Send or download the documentation

You can either send the documentation to en-email address, or download it.

Product Properties

Product specification

Declaration of Performance
DoP-SE-0011

PROPERTIES
Material consumption 1,8 kg/mm/m²
Application temperature Minimum 10°C
Hardening time before foot traffic 1-3 hours
Minimum thickness 20 mm
Maximum thickness 100 mm
External use No
Internal use Yes
Water demand Approx. 2,0 liter per 25 kg bag (8%)
Pot life (open time) Approx. 30-40 minutes (after adding water)
Compressive strength

 
Class C20 EN 13813
28 days: Mean value 35 N/mm² (MPa) EN 13892-2
Flexural strength Class F4 EN 13813
28 days: Mean value 6,5 N/mm² (MPa) EN 13892-2
Shrinkage 28 days: <1,0 mm/m EN 13454-2
Physical requirements (Reaction to fire)     Fire class: A2fl-s1 A1301 Primary deck covering, Marine EN 13501-1, IMO FTPC Part 6 and IMO FTPC Annex 2, section 2.2
Chemical requirements (of cured material)   pH 11 
Wear resistance (Rolling wheel)     RWFC 250 (thickness 2-30mm)
EN 13892-7
       
       

PACKAGING
25 kg bags on plastic wrapped pallets (40 bags per pallet.

Field of application

weber.floor 4670 is designed for use in marine- and offshore installations inside in cabin areas, wet areas and other high traffic areas, where there are demands for rapid surface strength for rapid laying of floor coverings. weber.floor 4670 satisfies the requirements of the authorities and classification bodies for screed mortars. weber.floor 4670 can be used as a bonded screed on steel-, galvanised steel- or aluminium decks. It can also be applied on existing concrete/cement-based or stone and ceramics substrates for ship repair purposes. weber.floor 4670 is hand-applied at thicknesses between 20 and 100 mm, and its soil consistency makes it easy to build slopes, form smaller ramps etc. weber.floor 4670 is not suitable as a final subfloor for floor finishes and should be covered with weber.floor 4660/weber.floor 4675/weber.floor 4690 to achieve a surface smoothness ready for floor covering, but it is not an absolute requirement for stone and ceramics. The combination of weber.floor 4665 and weber.floor 4660/weber.floor 4675/weber.floor 4690 is suitable as a finished subfloor for most floor coverings, such as PVC, vinyl, linoleum, stone and ceramics, carpets etc.

weber.floor 4670 is designed for use as a subfloor for most coverings and should not be used without a final floor finish. The floor covering should be applied as soon as the conditions allow. The product should not be used in a humid environment over 95% RH. Any special requirements for the floor covering concerned should be observed, comply with the requirements from the floor covering manufacturer. When the screed mortar has hardened and been smoothed, it will provide a finished sub-floor for most types of floor covering. If weber.floor 4670 is not covered within the stipulated drying time, or used as a working platform or transport area during the building process, sufficient cleaning is important to achieve a suitable substrate for the floor covering.

Storage

When stored in unopened and intact packaging, under dry conditions, shelf-life is min. 12 months from date of manufacture. Incorrect storage could have an adverse impact on the product properties. Older material should be tested, using the stipulated amount of added water to the mix, to ensure that the product properties are intact and the material cures within 1-2 hours after application. Longer setting times indicate that the product properties have been disrupted and the material should not be used. Avoid adding more water than recommended.

Application

Pre-treatment of substrate

The substrate should be mechanically prepared to remove impurities that might prevent adhesion and then vacuum cleaned. The substrate should be primed properly. Floor drains etc. should be protected with lids and separated with stop ends. Steel decks must be primed with weber.floor 4716 Primer diluted 5:1 with 5 parts of primer and 1 part of clean water, applied to the substrate using rubber squeegee, roller, brush or primer pump. On existing concrete/cement-based substrates for ship repair purposes weber.floor 4670 is applied ‘wet in wet’ before the primer has fully dried. Galvanised steel- and aluminium decks must be primed with weber.floor 4710N Epoxy Primer, applied to the substrate using a rubber squeegee and roller. After application and whilst the primer is still fresh, it must be sand-scattered completely with fire-dried quartz sand with grain size 1-2 mm. After the primer has cured all residual sand should be vacuum cleaned and the sanded surface should be primed with weber.floor 4716 diluted 1:3 with 1 part of primer and 3 parts of clean water. If another epoxy primer is being used, check for compatibility with weber.floor 4670. For details on the primers see separate product da¬tasheets for weber.floor 4716 and weber.floor 4710N. The function of the primers is to improve adhesion to the substrate, to prevent air bubbles and de-watering of the screed before hardening.

The temperature in the substrate should be above +10°C for the primer to create a film. For ideal working conditions the ambient air temperature of the work area should be +10-25°C. Light ventilation in the work area is necessary, but windows and openings should be closed sufficiently to avoid draughts during and after application. The dry-mix material should be kept in a heated area before use. Strongly cooled material conveys a risk that certain additives will not be able to dissolve during mixture.

The material can be used in higher ambient air temperatures in the work area up to approx. +40°C. In such conditions the workability of the compound and the flow properties should be observed as too high temperature strongly affects the pot life (open time) of the product, e.g. lead to flow properties changing and premature setting and hardening of the compound. To compensate for too high temperature of the work area and in the substrate it is recommended to cool down the added water with ice and also to restrain from using the material in direct exposure to sunlight. Keep the dry-mix material stored in a ventilated area not exposed for direct sunlight.

Mixing

weber.floor 4670 should be mixed by adding 2,0 litres of clean water per 25 kg bag (8% of the dry weight of the material). While mixing, ensure that the material is correctly mixed, and that the mixture is homogenous and free from separation. It is important to add the stipulated amount of water as excess water will reduce surface strength, increase shrinkage and encourage segregation. Conversely reduced water content increases viscosity. The temperature of the mix should ideally be between +10°C and 30°C. Once mixed, the compound remains workable for approx. 30-40 minutes under ideal working conditions but no further water should be added. Under too high temperature, the compound remains workable considerably shorter.

MIXING BY HAND
Mixing is done in a larger mixing drum or mixer (automatic batch mixer, paddle mixer, tombola) with room for 3-4 bags of dry material per batch, giving a total volume of 60-80 liters. First pour parts of the water into the mixing drum/mixer, then add weber.floor 4670. When emptying the bags into the mixing drum/mixer, keep it in an underpressure with a vacuum cleaner to reduce dust. Pour in the rest of the mixing water. The material and water should be mixed using a powerful mixer or drill fitted with a paddle or a beater for minimum 2 minutes, until a homogenous, lump-free soil consistency is achieved.

Application

Spread the mixed mortar over the substrate and level off with a straightedge on battens or steel pipes of the desired thickness. Start applying the mortar in the short end of the room. The surface may be smoothed by float or steel trowel after compression. In wet rooms and other rooms which require the floor to slope towards a drain, a batten or steel pipe must be placed against the wall. The mortar is then dragged towards the drain or other desired low point. Ensure that floor drains, holes etc. are properly sealed off prior to application to avoid clogged drains and pipes. weber.floor 4670 should be applied within 24 hours after the primer has cured to ensure proper adhesion.

HAND APPLICATION
For application pour the mixed mortar into smaller mixing buckets. Start in the farther end of the work area and distribute the mixed mortar in parallel with an end wall, finishing by an exit/opening, and level off using a straightedge on battens or steel pipes. Compress and smoothen the mortar lightly with a float or steel trowel. If possible, use two mixing buckets to ensure there is always fresh screed available during the application. The half-cured mortar can easily be formed and scraped, therefore do not wait too long with necessary fine adjustments. Any fine adjustment after the mortar has cured requires advanced grinding equipment. If the surface should be over laid with weber.floor 4660, weber.floor 4675 or weber.floor 4690 within 2-3 days the surface should be primed with weber.floor 4716 twice, provided that the screed has dried out sufficiently enough for the primer to penetrate down and form a film. First coat diluted 1:5 with 1 part of primer and 5 parts of clean water, and second coat diluted 1:3 with 1 part of primer and 3 parts of clean water.

After-treatement

Due to its coarser surface structure the mortar should be fine smoothed with weber.floor 4660, weber.floor 4675 or weber.floor 4690 before final floor finish, such as PVC, vinyl, linoleum, carpets etc., but it is not an absolute requirement for stone and ceramics. weber.floor 4670 allows foot traffic after approx. 1-3 hours. Before laying the floor covering it should always be checked that the structure has dried out sufficiently for the chosen type of floor covering. weber.floor 4670 can be over laid with a floor covering after approx. 1 day provided the floor covering will withstand minimum 85% RH, comply with the requirements from the floor covering manufacturer. The stated drying time assumes good drying out conditions of +20°C, 50% RH and an exchange of air. The surface can be over laid with stone and ceramics in dry conditions after approx. 4 hours.

The mortar should not be used without final floor finish. Cover within 7 days. If not possible to cover with final floor finish within 7 days, cover with temporary covering such as plastic foil, waxed paper, geotextile with plastic backing to prevent the screed from drying out too much increasing the risk for shrinkage cracks. Ensure that all overlaps in the covering and floor-to-wall joints are properly sealed off and tight. weber.floor 4670 is self-drying, and dries out and cures from within, which means it quickly attains a surface strength and that surplus water is chemically bonded over time. If the surface is not covered in time, moisture that the screed needs internally to cure properly evaporates into the air. The surface may be primed with weber.floor 4716 diluted 1:5 with 1 part of primer and 5 parts of clean water to prevent the screed from too rapid drying out.

Practical advice

Tools and machinery should be cleaned for fresh material using water. Hardened material should be removed mechanically. To check that the screed has been installed according to the manufacturer’s instructions, it is possible to measure the surface tensile strength. After 28 days curing the value should be > 1,0 N/mm2 (MPa). Contact Weber for more details. Dehumidifiers should not be used for the first two days after application. Gas heating should not be used prior to priming and application. Please observe that slow drying out due to low temperatures could affect the performance of the mortar.

Health & Safety

Safety instructions

See current Material Safety Data Sheet.

Disclaimer

Since there are different conditions and requirements that apply in any case, Saint-Gobain Byggevarer AS cannot be liable for other than the information provided in this product datasheet. Examples of information and conditions beyond Saint-Gobain Byggevarer AS’s responsibility (if specially pointed out or not), involves storage, construction, preparation, how the product works together with other products, workmanship and locale conditions. The information provided in this product data sheet is based on our current knowledge and experience about the product. All of the above information must be considered as guidelines. It is the user’s responsibility to ensure that the product is suitable for the intended use, and also to perform acceptance check and self-inspection control. The user is responsible if the product is used for purposes other than recommended or for improper installation.